Along the River Brent, Ballymore’s Brentford Project is transforming ahistoric industrial site into a vibrant new waterfront neighbourhood. Newhomes, public spaces, retail, and riverside walkways are bringing fresh lifeback to this part of West London.
Our role covered both sides of the finish. Through builders cleaning andabseiling, we handled the internal and external cleans needed to help bring thefirst phase over the line.

The Brentford Project is a large-scale regeneration designed to reconnect Brentford High Street with the waterfront. The first phase delivers 327 apartments, alongside restaurants, retail, and public realm that reshape the area into a modern riverside destination.
With apartments, communal spaces, and external elevations all progressing toward completion at the same time, the final clean had to be handled with care, coordination, and the right access methods.


On a project like this, presentation matters inside and out. That meant combining builders cleaning internally with rope access support externally to make sure the whole development was ready for handover.
Across hundreds of apartments and multiple buildings, the result was a development brought to completion clean, controlled, and ready for handover.
At The Brentford Project, our builders cleaning and abseiling works helped bring the first phase into its final form. Across 327 apartments, shared internal areas, and external elevations, the development was prepared for completion with the standard a riverside scheme like this demands. Clean inside. Clean outside. Ready for its next chapter.









Partner with Smiley Paints for expert painting and cleaning solutions. Contact us to bring your vision to life.
Get in Touch