Riverside Regeneration, Properly Finished

THE BRENTFORD PROJECT

Along the River Brent, Ballymore’s Brentford Project is transforming ahistoric industrial site into a vibrant new waterfront neighbourhood. Newhomes, public spaces, retail, and riverside walkways are bringing fresh lifeback to this part of West London.

Our role covered both sides of the finish. Through builders cleaning andabseiling, we handled the internal and external cleans needed to help bring thefirst phase over the line.

Explore our Case Studies
painting
No items found.
Project OVERVIEW

A Major New Chapter for Brentford

The Brentford Project is a large-scale regeneration designed to reconnect Brentford High Street with the waterfront. The first phase delivers 327 apartments, alongside restaurants, retail, and public realm that reshape the area into a modern riverside destination.

Our Job?
Builders Cleaning & Abseiling.
Developer?
Ballymore.
327 Residential Apartments.
First Phase Delivery?
327 Residential Apartments.

With apartments, communal spaces, and external elevations all progressing toward completion at the same time, the final clean had to be handled with care, coordination, and the right access methods.

project-overview
project-overview
OUR APPROACH

Internal and External Finishes, Fully Covered

On a project like this, presentation matters inside and out. That meant combining builders cleaning internally with rope access support externally to make sure the whole development was ready for handover.

Clean Spaces Start With Control
Apartments, corridors, and communal areas were cleaned methodically to remove construction dust, residue, and marks left behind by final trades. The goal wasn’t “tidy.” It was inspection-ready.
Working From the Inside Out
While internal teams progressed through apartments and communal areas, our rope access teams handled the external elevations, ensuring façades and glazing matched the finish inside.
No Corners Left Behind
Large developments mean repetition, but every unit still has to meet the same standard. From individual apartments to shared circulation areas, every space was brought up to handover condition.

Across hundreds of apartments and multiple buildings, the result was a development brought to completion clean, controlled, and ready for handover.

RESULT

Ready for the Riverside

At The Brentford Project, our builders cleaning and abseiling works helped bring the first phase into its final form. Across 327 apartments, shared internal areas, and external elevations, the development was prepared for completion with the standard a riverside scheme like this demands. Clean inside. Clean outside. Ready for its next chapter.

No items found.

TRUSTED BY TOP BUILDERS

Ready to Achieve Exceptional Results?

Partner with Smiley Paints for expert painting and cleaning solutions. Contact us to bring your vision to life.

Get in Touch
back-to-top